Com­mu­nity Care Projects

Drayton Works Garage
Owner: County of Wellington
Con­sul­tant: Grinham Architects Inc.
Project Value: $4.3M

New construction of a 2-storey 20,100 sq.ft. pre-engineered garage complete with 3 equipment storage bays, 4 large vehicle service bays, small truck hoist/service bay, welding bay, 5 ton crane, and tool/parts room. Main floor also includes offices, storage rooms, wash/change rooms. Second floor includes lunch room, washrooms, and offices. Extensive sitework, new well and septic. Construction of a 9,600 sq.ft. salt storage dome. Construction of a pump house complete with 2 storage tanks.


Port Nelson United Church Addition
Owner: PNUC
Con­sul­tant: Reinders & Reider Ltd.
Project Value: $3.0M

Addition and renovation to existing church building in suburban Burlington. Partial demolition of existing 1-storey building for 11,000 sq.ft. addition to accommodate offices, fellowship hall, kitchen, washrooms, family areas, library and storage/janitorial areas. Sitework includes: landscaping and parking. Building was partially occupied and construction was phased to accommodate ongoing church functions.

 

Palmerston Affordable Housing
Owner: County of Welling­ton
Con­sul­tant: Grinham Architects Inc.
Project Value: $2.7M

New construction of a 2-storey, 11-unit affordable housing building. 2 and 3 bedroom apartment-style units and 1 barrier-free unit.  featuring steel roof shingles, framed glass balcony railings, combination of drywall and masonry interior, wood frame construction. Also includes a common area, and laundry facility.


Speed­vale Affordable Housing Addi­tion
Owner: County of Welling­ton
Con­sul­tant: Brown & Beat­tie Ltd.
Project Value: $1.8M

3,000 sq.ft. 2-​storey addi­tion to join 2 exist­ing and occu­pied multi-​unit res­i­den­tial build­ings. Addi­tion includes: 2 res­i­dence units, com­mon room, lobby, bike/​scooter stor­age, new ele­va­tor and stairwell.


Richview Library Ren­o­va­tions
Owner: Toronto Pub­lic Library
Con­sul­tant: ward 99 Archi­tects
Project Value: $1.9M

Phase 1: Inte­rior ren­o­va­tion of the base­ment level (17,850 sq.ft.) of an exist­ing 2-​storey library. Includes select demo­li­tion, asbestos abate­ment, replace­ment floor­ing, mill­work, doors, toi­let acces­sories, instal­la­tion of visual dis­play boards and oper­a­ble par­ti­tions. HVAC, plumb­ing, sprin­kler, and elec­tri­cal upgrades.
Phase 2: Exte­rior upgrades includ­ing; select demo­li­tion and site removals, land­scap­ing, con­crete form­ing, rebar sup­ply, masonry, mis­cel­la­neous met­als, HM frames and doors, alu­minum frames and doors, glass, door hard­ware, dry­wall and acoustics, floor­ing, paint­ing, fire sprin­kler, mechan­i­cal and elec­tri­cal. Owner-​occupied.

RV4.JPGRV2.JPGRV3.JPGRV1.JPG

Fer­gus Library Addition/​Renovation 
Owner: County of Welling­ton
Con­sul­tant: +VG Archi­tects
Project Value: $3.8M

Demo­li­tion of exist­ing rear addi­tion of the Carnegie library (circa 1911). Inte­rior ren­o­va­tions to exist­ing library and 3-​storey rear replace­ment addi­tion; increas­ing the library space from 5,000 to 15,000 sq.ft. Cre­ated ground-​level acces­si­ble front entrance. Rec­og­nized by the United Nations Green Legacy Pro­gram – Emer­ald Standards.

Fergus5.jpgFergus3.jpgFergus1.jpgFergus4.pngFergus2.jpg

St. George’s Angli­can Church 
Owner: St. George’s Lowville Angli­can Church
Con­sul­tant: Cham­ber­lain Archi­tect Ser­vices Inc.
Project Value: $2.2M

New con­struc­tion of a one-​storey 11,200 sq.ft church; com­plete with a cathe­dral chapel, library, offices, 3 class­rooms, nurs­ery, and kitchen. The civil and land­scap­ing scope includes park­ing, grad­ing, and site services.

STG1.JPGSTG2.JPGSTG4.JPGSTG3.JPG

Guelph Fire Hall #3 Ren­o­va­tions
Owner: City of Guelph
Con­sul­tant: Thomas Brown Archi­tects
Project Value: $489K

Exterior/​interior ren­o­va­tions to exist­ing fire hall (4,500 sq.ft.); includes roof mem­brane and flash­ing replace­ment, new floor­ing, upgrades to liv­ing quar­ters and washroom/​shower facil­i­ties, upgrades to HVAC and elec­tri­cal sys­tem. The work also includes asbestos abate­ment and relo­ca­tion of rooftop solar panels.


Bishop Far­rell Library & Archives Renovations
Owner: Dio­cese of Hamil­ton
Con­sul­tant: Grguric Archi­tects Inc.
Project Value: $1.3M

7,500 sq.ft inte­rior ren­o­va­tion to 1-​storey build­ing (offices and library) plus base­ment archive room to include ele­va­tor instal­la­tion, replace­ment of win­dows, floor­ing, paint­ing and exte­rior acces­si­bil­ity ramp. Com­plete retro­fit to boiler sys­tem includ­ing new equip­ment and piping. Owner-occupied.

Chancery1.JPGChancery2.JPGChancery4.JPGChancery5.JPG

Mark Preece Fam­ily House Renovations
Owner: Hos­pi­tal Fam­ily Houses of Ontario
Con­sul­tant: Atkin­son Engi­neer­ing Inc.
Project Value: $508K

6,000 sq.ft. 2nd floor (9 bed­rooms and a board­room) and base­ment (kitchen) fit-​up. Con­struc­tion occurred while the build­ing was occu­pied by own­ers, guests, and house staff. CCDC-5B contract.

Mark Preece House 1.pngMark Preece House 2.JPGMark Preece House 4.JPGMark Preece House 3.JPG

Ronald McDon­ald House Hamil­ton Addition/Renovation
Owner: Kids Care Oncol­ogy Cen­tral West Ontario
Con­sul­tant: Perkins + Will
Project Value: $9.8M

32,000 sq.ft. 3-storey plus basement addition including 25 accommodation units, full catering kitchen, a large family kitchen/dining area, play and theatre areas, washrooms and storage rooms. 15,000 sq.ft. renovations to existing 15-unit building including HVAC, electrical, painting and flooring upgrades. Project also included parking lots, sidewalks and landscaping that involved saving mature trees and installing astro-turf in the courtyard. Office staff and residents occupied the existing building until the new addition was complete. Coordination of Gifts-in-Kind and various donations of furnishings and finishing products. Construction site was constrained on the corner of a busy urban intersection, adjacent to McMaster University.

RMH3.JPGRMH6.JPGRMH5.JPG

Ontario Breast Screen­ing Pro­gram Renovations
Che­doke Hos­pi­tal — Wilcox Level 4 

Owner: Hamil­ton Health Sci­ences
Con­sul­tant: Their & Cur­ran Archi­tects Inc.
Project Value: $1.5M

12,500 sq.ft. inte­rior ren­o­va­tions to cre­ate offices and exam­i­na­tion rooms. Infec­tion con­trol and haz­mat reme­di­a­tion. Adja­cent areas of the hos­pi­tal are owner-​occupied. Upgrades include HVAC, elec­tri­cal, floor­ing, paint­ing, doors/​hardware and millwork. Owner-occupied.

OBSP3.JPGOBSP2.JPGOBSP4.JPGOBSP5.JPGOBSP1.JPG

Welling­ton County Library – Puslinch Branch
Owner: County of Welling­ton
Con­sul­tant: Grin­ham Archi­tects Inc.
Project Value: $1.5M

New construction of a library using sustainable design/construction; complete with exposed Douglas Fir timber framing (interior and exterior), rain harvesting system, light harvesting system, green roof, fiber cement board siding and concrete in-floor radiant heat. Recognized by the United Nations Green Legacy Program – Emerald Standards.

PUS4.JPG

Philpott Memo­r­ial Church Ren­o­va­tions
Owner: Philpott Memo­r­ial Church
Con­sul­tant: Their & Cur­ran Archi­tects Inc.

Project Value: $686K

Inte­rior ren­o­va­tions (500 sq.ft.) to chapel, atrium, wash­rooms, kitchen, nurs­ery, and exit/​entrance cor­ri­dor. Includes select demo­li­tion, replace­ment floor­ing, win­dows, mill­work, and doors, as well as, HVAC, plumb­ing, and elec­tri­cal upgrades. Owner-​occupied.

Philpott1.pngPhilpott2.pngPhilpott3.png